Overview:
Keeping current with the latest regulatory requirements and industry guidance can be a challenge when you have a hundred and one tasks to complete.
The GAMP® 5 (3 Day) Training goes beyond our Fundamentals of GAMP® 5 Guidance by investigating in depth the main topics in the latest version of GAMP® 5: A Risk-Based Approach to Compliant GxP Computerised Systems, and reviewing sample appendices from the following sections: Development, Management, Operation and Special Interest Topics.
Taking the opportunity to attend this course is useful for people working in healthcare manufacturing and related IT departments. Suppliers can also benefit. National Blood Service employees and other industries such as bank ATM manufacturers have also attended this course.
So if you want a full working understanding of current regulatory thinking on computerised systems in industry, for IT, process control systems and manufacturing/packaging equipment, why not attend our course?
Content:
Day 1
Investigate the reasons for the GAMP® 5 version update
Industry developments
Regulatory drive including Quality Risk Management, ICH Guidance and integration into QMS
Latest terminology and common themes including relationship between Qualification Terminology and GAMP® 5 activities
Compare the differences between GAMP® 4 and GAMP® 5
Review the life cycle approach and phases, including: life cycle concepts; concept, project and retirement
Introducing Quality Risk Management
Describe regulated company activities to assure computerised system compliance
Develop understanding of guidance on supplier activities
View help for suppliers; non configured product, configured product and custom package
Investigate supplier best practices
Day 2
Consider guidance on efficiency improvements
Specific points in determining objective user requirements
Utilise risk assessment practice to determine life cycle activities
Influence supplier input and maximise use of own documentation
Effective testing and system handover
Operational activities
Review main article topic 4, Life Cycle Phases, related Management Appendices
M1 Validation Planning
M2 Supplier Assessment
M4 Categories of Software and Hardware
M5 Design Review and Traceability
M7 Validation Reporting
Investigate changes to appendices and also new management appendix M10
View appendix M3 Science Based Quality Risk Management relative to article 4 and 5 in the main contents of the guide
Day 3
Research remaining appendices
D2 Functional Specification
D3 Configuration and Design
D4 Incident Management
D5 Testing relative to article 4
Check revised appendices and new appendices
D6 System Description
D7 Data Migration
Develop understanding of new Operational Appendices covering
Investigate the special interest topics appendices
S1 Alignment of ASTM E2500
S2 Electronic Production Records
S3 End User Applications
S4 Patch Management
S5 Managing Quality within an outsourced IS/IT environment
S6 Organisational Change
Review of G1 GAMP® Good Practice Guides